anx_V__para__10
6. The verification shall be based on a strategic analysis of all the activities carried out in the installation. This requires the verifier to have an overview of all the activities and their significance for emissions.
← anx_V__para__9 · All articles · anx_V__para__11 →
Source: EUR-Lex CELLAR · retrieved 2026-08-09 · Text as consolidated on 2024-03-01; changes after this date are not shown.