art_47__para
IED
In the case of a breakdown, the operator shall reduce or close down operations as soon as practicable until normal operations can be restored.
← Article 47 · All articles · Article 48 →
Source: EUR-Lex CELLAR · retrieved 2026-08-09 · Text as consolidated on 2024-08-04; changes after this date are not shown.