lexiara

(i)

CRR3

in the first subparagraph, the introductory wording is replaced by the following: ‘The multiplication factor (mc) shall be equal to at least the sum of 1,5 and an add-on determined in accordance with Table 3. For the portfolio referred to in paragraph 5, that add-on shall be calculated on the basis of the number of overshootings that occurred over the most recent 250 business days as evidenced by the institution’s back-testing of the value-at-risk number calculated in accordance with point (a) of this subparagraph. The calculation of the add-on shall be subject to the following requirements:’ ;

· All articles ·

Source: EUR-Lex CELLAR · retrieved 2026-09-04 · Text as adopted (Official Journal); later amendments are not incorporated in this text.